Alamon Helps Build the Nation’s Fastest Growing EV Charging Network
Every day is a new opportunity to make a connection. At Alamon, we’re grateful for our newest connection, EVPassport. They’re the forward-thinking company that’s on a mission to accelerate EV adoption by providing affordable, best-in-class charging solutions.
We’re helping EVPassport expand the nation’s fastest growing EV charging network by providing best-in-class, full-scope EV charger installation expertise.
Licensed electricians capable of full power assessment and upgrades? Check. Conduit, wiring, panel expansions? Check. On-site RF testing and cellular booster installation to ensure strong connectivity for the chargers? Check.
Alamon recently completed the installation of six EVPassport chargers at The Charlie in La Mirada, CA, including one ADA-compliant stall. To support the system, we installed a dedicated sub panel, pulled power from the house panel, and routed conduit to each charger.
Tire stops were added to all stalls to keep parked vehicles a safe distance from the chargers, and we installed a full cellular booster system (1 receive antenna, 1 boost module, and 2 transmit antennas) to ensure stable connectivity. After powering up, we initiated the internal testing phase and completed the post-construction checklist for EVPassport.
Although originally scoped as a two-week job, we completed the build in just 6 days.
With an exceptional safety record and a 50 year legacy of high-quality infrastructure installations, our employee-owner teams love this work, and it shows. Thank you, EVPassport!
Project Overview
- Pre-construction site walk and cellular infrastructure analysis
- System design
- Plan review and submission to the city for permit
- Installation of new 250amp, 3ph panelboard
- Installation of (6) new 11kw EV chargers
- Installation of DAS system to support the communication of the EV chargers
- Installation of concrete wheel stops

